Movable swimming pool floor replacement for De Kwakel

In swimming pool de Kwakel in Utrecht (NL), the Variool assembly team has completely replaced the prefabricated polyester panels and complete the hydraulic installation of the competition pool on behalf of the municipality of Utrecht. This was done in a filled pool that has served 23 years of faithful service.

Movable pool floor replacement while pool is filled

By carrying out the work in a filled swimming pool, this can be done in just 1.5 weeks, and the installation is again “future proof”. They can make use of the swimming pool again when it is allowed by the current corona measures. The same work was also carried out last year for the existing target group pool. After completion of these activities, both movable pool floor installations are operational again, reliable and both installations can last for at least 20 years.