Variopool and its partner Seahan Corporation have visited the new swimming pool complex in Siheung (South Korea) where a DUO movable floor and horizontal boom installation have been put into use.
Swimming pool in Siheung ready for use
According to expectations, the main contractor is extremely satisfied with the end result, and the residents can now use these new facilities. The 50 m competition pool can easily be divided in two parts by using the horizontal boom. As a result, the swimmers can perform their training sessions on one side, and school swimming lessons can be given on the other side of the horizontal boom by means of the DUO movable floor that is set to the desired depth.
Variopool thanks the entire Saehan Corporation team for the excellent teamwork that has been done with the wonderful end result!