Last week the elements for the vertical bulkhead of Variopool B.V. were delivered in Aalst, Belgium. A great moment for us, as we will soon start with the dry assembly of the bulkhead. Besides the vertical bulkhead, Variopool will also install two movable floors. The entire bottom of the pool will then be made up of Variopool products. A great concept in cooperation with Slangen + Koenis Architects and Cordeel Belgium.
We can’t wait to get started! More information will be online upon completion of this beautiful project.